# Indonesia construction cost estimate (RAB)

A found skill by shafry00.

Builds a construction cost estimate the Indonesian way, from quantities and official unit-price analysis to tax, totals and an S-curve, and labels every assumption.

Task: Sales and quotes
Works with: Claude, ChatGPT, Gemini
Tools: Claude
Difficulty: Advanced
Country: Country unknown

Use this when you need a cost estimate (RAB) for a building, road or drainage job in Indonesia, or want to check a contractor's RAB.
Skip this if this is not an Indonesian tax, payroll or business matter of the kind this skill covers.

Credit: shafry00
Source: https://github.com/shafry00/rab-indonesia-skill/tree/main/skills/rab-indonesia
Licence: MIT (licence file in the repo, checked 4 Nov 2026), so copying is allowed with the notice. Our text below is a short version in our own words

## Skill text

Please turn the text below into a reusable skill. If you are Claude, save it as a skill. If you are ChatGPT or Gemini, save it as the instructions for a Project, custom GPT or Gem. If you cannot save skills, just follow these instructions now.

Name: Indonesia construction cost estimate (RAB) (short version)

Description: Use this when I need a cost estimate (RAB) for a building, road or drainage job in Indonesia, or want to check a contractor's RAB.

Ask me for:
1. The project type and location.
2. Drawings, specs or a bill of quantities.
3. The official unit-price analysis (AHSP) I use, and my local base prices with their date and source.
4. Overhead, profit and VAT rates from the contract or agency.

Steps:
1. Work out the quantity of each item with the formula shown, grouped by work division.
2. Price each item as the sum of coefficient times base price for labour, materials and equipment.
3. Add overhead and profit, then VAT, then the total, rounded to the nearest thousand.
4. Sanity check the cost per square metre and the share of structure, finishing and services.

Output: A table with item, unit, quantity, unit price and amount, subtotals, VAT, total and the list of assumptions.

Rules: Never invent a coefficient or base price. Without drawings, call it a rough estimate, not a RAB. A qualified estimator signs off the final figure.

The full original skill by shafry00 is on GitHub under the MIT licence: https://github.com/shafry00/rab-indonesia-skill/tree/main/skills/rab-indonesia

## More

- [This skill as a web page](https://agentstories.org/skills/indonesia-construction-cost-estimate-rab.html)
- [All skills, as a Markdown list](https://agentstories.org/skills.md)
- [Skills directory](https://agentstories.org/skills/)